Delivery upstairs
Coordinate delivery to the site and the floor where the equipment will be used.
Delivery and installation
From delivery upstairs to site conditions, connection, commissioning and handover, Qingchuan helps move drinking-water equipment from arrival into daily operation.

Why service matters
Water, power, drainage, access and working space affect how a drinking-water point can be installed and maintained.
Coordinate delivery to the site and the floor where the equipment will be used.
Coordinate the customer contact and installation timing.
Complete the agreed connection, commissioning and use check.
Discuss extended piping, drilling or water and electrical modifications separately.
Service lifecycle
Coordinate the carrier and site handover before installation.
Confirm the basic conditions before the visit.
Arrange the visit and contact the customer.
Connect the equipment at the agreed drinking point.
Connect, power up, test and confirm the operating approach.
Leave the user with a clear path for support.
01 — Delivery and standard installation
Delivery is coordinated through carriers such as SF Express and Suxin Jiada, with delivery upstairs as the core handover commitment. Drinking-water equipment includes nationwide free on-site installation. Filters and parts are not treated as equipment installation projects by default.
Installation, connection, commissioning and basic use confirmation are included for the equipment order.
Consumable or parts-only orders follow their own delivery and service arrangement.
02 — Before installation
The exact requirements depend on the selected equipment and site. Confirm them before arranging the visit.
Confirm the available water connection and power conditions.
Review drainage, access, working space and the intended drinking point.
03 — Additional work
Extended pipe runs, drilling, pipe welding, hot-water or electrical modification and other additional site work should be assessed and confirmed separately.
Describe the condition before work is arranged so the scope can be understood.
Any additional work and its arrangement are confirmed according to the actual site.
04 — After installation
After commissioning, the equipment can connect to filter, repair and parts support according to the product and service conditions.
Confirm the basic operating approach with the people using the drinking point.
Keep the route to warranty, maintenance and repair support clear.
Product and solution connections
From product selection to the operating setting, service support should make the next step clearer.
Direct after-sales contact
Share the equipment, city and installation conditions so the delivery path can be discussed clearly.
Please scan with WeChat to contact After-sales Support
Practical questions
Delivery is coordinated through carriers such as SF Express and Suxin Jiada, with delivery upstairs as the core handover commitment. Drinking-water equipment includes nationwide free on-site installation. The exact project arrangement should be confirmed during consultation.
Extended piping, drilling, pipe welding and other additional water or electrical work are not assumed to be included. They require separate confirmation based on the site.
Filters and parts-only orders are outside the default equipment installation scope. Their service arrangement should be confirmed for the specific order.
Delivery and installation
Share the equipment, city and installation conditions so the delivery path can be discussed clearly.